Comparison Β· Hardware
When the question is βwhich GPU?β
Training hardware is often oversized for inference. KI:KUBE relies on inference-optimised Spark nodes: here is how it compares with common 4-GPU configurations, using verified market prices.
GPU comparison
Putting it in context
Note: The KI:KUBE price is a turnkey overall package (hardware + software stack + setup). The GPU rows show the bare card price (4Γ GPU) and, as βfull node ββ, the complete machine including the rest of the system; both are pure hardware, without software stack, integration or operation. Best price net (plus VAT), as of 2026-06-22.
| Configuration | Total VRAM | Price Β· net 4 cards / full node β | Availability & power |
|---|---|---|---|
| 4Γ DGX Spark (KI:KUBE) | 512 GB unified | ~β¬30k | Turnkey overall package (hardware + software stack + setup): no single-card listing. Power: ~0.6 kW (whole system, measured) |
| 4Γ NVIDIA H100 80 GB (PCIe) | 320 GB | not representative | Effectively not available through regular channels: H100 80GB PCIe only as a single listing at ~β¬53,550 gross (~β¬45,000/card net); the separate H100 NVL 94GB variant is listed from ~β¬32,700 gross. Volatile. Power: ~2.3 kW* (full node, estimated) |
| 4Γ NVIDIA H200 NVL 141 GB | 564 GB | fromΒ β¬132,000 Full node βΒ β¬140,000* | Available immediately (market price from β¬39,270 gross/card, delivery 1 to 2 working days). Price up markedly because of the 2026 HBM3e shortage, volatile. Power: ~3.4 kW* (full node, estimated) |
| 4Γ AMD MI300X 192 GB | 768 GB | β Full node OEM system* | Not sold individually at retail (OAM module): only as a finished OEM system (Supermicro/Dell/Gigabyte). Power: ~4.0 kW* (full node, OEM system) |
| 4Γ RTX 5090 (GeForce) | 128 GB | fromΒ β¬13,180 Full node βΒ β¬20,500 | Available (market price from β¬3,920.75 gross/card), made even more expensive by the 2026 GDDR7 shortage; 4 thick cards (3 to 3.5 slots) barely fit physically into one chassis. Only 32 GB/card (128 GB in total), no ECC, no NVLink, consumer driver/licence. Power: ~3.0 kW (full node, AC) |
| 4Γ RTX 6000 Ada 48 GB (PNY) | 192 GB | β¬23,731 Full node βΒ β¬31,700 | Available (market price from β¬7,059.90 gross/card). Quantity per retailer sometimes limited (e.g. 2 per customer). Price spikes and supply shortages quite possible. Power: ~1.9 kW (full node, AC) |
| 4Γ RTX PRO 6000 Blackwell 96 GB | 384 GB | β¬40,303 Full node βΒ β¬54,100 | Readily available (PNY Workstation Edition from β¬11,990 gross/card). Full-node price derived from a specific retailer quote (ASUS ESC4000A-E12, 2U, EPYC 9355P, Max-Q), as of 2026-06-24. Price spikes and supply shortages quite possible. Power: ~1.9 kW (full node, AC; Max-Q) |
| 8Γ NVIDIA B200 (HGX system) | 1.4 TB | β¬413,736 | Datacentre Blackwell: only as a complete 8-GPU HGX OEM system (no 4-GPU node), not listed at retail or on price-comparison sites (system price indicative, on request), ~60 working days delivery. Training class, absurdly oversized for inference. Power: ~14 kW (8-GPU system) |
Cards β finished node
The table shows card prices only. A fully integrated 4Γ RTX PRO 6000 node is actually offered from ~β¬54,100 net: a specific retailer quote for an ASUS ESC4000A-E12 (2U, AMD EPYC 9355P 32 cores, 2600 W power supply, 3.84 TB NVMe + 2Γ 12 TB HDD, 4Γ RTX PRO 6000 Blackwell Max-Q), as of 2026-06-24. And that is with only 16 GB of RAM: a production-grade RAM configuration realistically pushes the price to β¬56,000 to β¬62,000 net because of the 2026 DRAM shortage. In operation, the node draws ~1.9 kW from the grid under full load, compared with ~0.6 kW for the KI:KUBE. On top come software integration, model validation and operation, which are already included in the KI:KUBE package.
GPU row prices: indicative market prices (online distributors/retailers), in each case best price net (plus 19% VAT), cards only without the rest of the system, as of 2026-06-22; β4Γβ = four cards. The B200 row is a complete 8-GPU HGX system (not a 4-GPU node): values are not comparable per GPU with the 4-GPU rows. Power = full-node mains draw (AC) under full load: 4Γ GPU TDP + ~0.5 to 0.8 kW for the rest of the system (CPU, board, RAM, cooling/ventilation), including power-supply losses; KI:KUBE value measured. Power values marked with * are estimates (datacentre/OEM configuration varies). Full node β = complete machine including the rest of the system (CPU, board, RAM, power supply, rack, cooling/ventilation). The RTX PRO 6000 route is derived from a specific retailer quote (ASUS ESC4000A-E12, 2U, EPYC 9355P, as of 2026-06-24; list price β¬54,074 net, with minimal 16 GB RAM configuration), the other RTX routes from the verified bill of materials (rest of system ~β¬8k net, best case, RAM prices volatile). Full-node values marked with * are rough estimates (card price + ~β¬8k for the rest of the system): H100/H200 are datacentre cards, MI300X is only available as an 8-GPU OEM platform: real server/OEM configurations are usually higher. Market situation 2026: HBM/DRAM shortage: prices high and volatile, best prices and availability sometimes change daily. The KI:KUBE price is an overall package (hardware + software stack + setup), not a single-card quotation. Please note the notices on comparison prices and calculator results.
Service & supply chain
Monolithic vs. modular: what does a failure cost?
The price is only one half. The other shows up when hardware fails, and in the supply-chain risk, which often only becomes apparent in a service case.
Monolithic server (e.g. ASUS ESC4000A-E12)
- βOne chassis: a board or power-supply failure = total outage of the whole node.
- βConfiguration and parts go through the distributor/vendor channel: RMA of the entire device instead of replacing a part.
- βFewer individual parts, but a single, vendor-bound repair path.
KI:KUBE (modular, multi-OEM)
- βA failure = at worst a single node swapped; depending on topology, the rest keeps running in degraded mode. *
- βDGX Spark = NVIDIA reference design (ASUS, HP, Dell, Lenovo, MSI, Gigabyte): a replacement node from any OEM, available at retail.
- βSwitch, control node, rack and power supplies are standard parts: often next-day from the distributor, no gold partner needed.
* Anyone who wants to be on the safe side simply puts a second KI:KUBE next to it for redundancy, and enjoys double the performance in normal operation π
A fair assessment: More individual parts (several nodes + switch + control node) statistically also mean more possible points of failure, and the switch and control node are single points of failure with the KI:KUBE too. The advantage does not necessarily lie in a lower failure frequency, but in repairability, recovery time (MTTR) and supply-chain independence.
Architecture logic
Why not H100?
H100 (and H200) are training cards: designed for FP16/BF16 workloads with large batches. For inference of production models in quantisations such as NVFP4/FP8/INT8, the DGX Spark architecture is economical for inference workloads and, in our measurements, energy-efficient. The premium for H-class hardware pays off if you want to train or fine-tune your own models, which few KI:KUBE buyers need.
MI300X: lots of memory, less mature software
AMD's MI300X has 192 GB of HBM per GPU and is impressive as hardware. The ROCm toolchain still has gaps compared with CUDA (as of 2026): fewer optimised quantisation kernels, fewer models out of the box, more in-house engineering. An option for research institutions with a suitable team, but hardly for production use in a law firm.
RTX workstation: works for 70B
4Γ RTX 6000 Ada (192 GB) is enough for models up to ~70B FP16 or ~120B in INT4. For pure frontier workloads (Qwen3.5-397B, DeepSeek-V3 with MoE), the memory is too small, or the quantisation becomes so aggressive that output quality suffers.
See KI:KUBE working on one of your own documents.
Hardware recommendation in the initial call